Model·Foundations

ParetoQ, the strongest low-bit QAT I could find

I went looking for the current state of the art in 2- and 3-bit quantization-aware training, with the requirement that the evidence be auditable. ParetoQ won: a 2-bit Llama-3 8B within 3.4 points of full precision, an official repo whose core is one file, and three findings about training that matter beyond quantization. Includes what the code does that the paper's equation gets slightly wrong.

Authors
Zechun Liu, Changsheng Zhao, Hanxian Huang, Sijia Chen, Jing Zhang, et al. · NeurIPS 2025 · 2025
Audit
reference code read at 7b36b8d · July 12, 2026
Claims
3 verified2 partial1 unverified
Note
reviewed repro: partial published July 12, 2026 · updated July 13, 2026

Core insights. ParetoQ is the first framework that trains 1-bit, 1.58-bit, 2-bit, 3-bit, and 4-bit models with one recipe, which is what finally makes the “which bit-width is best” argument answerable rather than a fight between papers with different setups. Three findings survive contact with the code. First, given a fixed token budget, spend roughly 90% on normal full-precision training and 10% on quantization-aware training; both pure post-training quantization and QAT-from-scratch lose to this split. Second, there is a phase change between 3 bits and 2: at 3–4 bits, training nudges weights within their original neighborhoods, while at 2 bits and below the network substantially rewrites its weights. Third, because of that phase change, the shape of the quantization grid stops being a detail: 2-bit wants symmetric levels with no zero, 3–4 bit wants the standard integer grid with zero. The headline number is a 2-bit Llama-3 8B at 71.2 average zero-shot accuracy versus 74.6 for full precision, where the best prior QAT method lost 9.1 points. And the entire method, once again, is one readable file.

Method

Why this paper

The brief I set myself: the best 2–3 bit quantization-aware training result available today, judged on average benchmarks against other methods, with a paper, code, and LaTeX source I could audit. I compared the QAT lineage (LLM-QAT, BitDistiller, EfficientQAT, ParetoQ) and then went hunting for 2025–26 papers claiming to beat it. The hunt turned up one real challenger and a lot of noise. LC-QAT (ICML 2026) reports 73.42 versus ParetoQ’s 72.07 on the Llama-3-8B six-task average using 4B tokens against 30B, which is a serious efficiency claim; but its perplexity is worse (9.38 vs 8.00), it loses two of the six tasks, it stores weights as vector-quantization codebooks rather than plain integers, and the paper contains no code link anywhere despite its abstract page promising one. Bit-by-Bit (April 2026) is the boldest claim, a sweep of ParetoQ on every metric; but the fine print says its “ParetoQ” baseline was re-trained by the authors on roughly 1/3600th of the original token budget to match their own setup, and the resulting baseline numbers (45.8 zero-shot average on Llama-3.2-3B, versus ~63 in ParetoQ’s own results) are nowhere near the published ones. Read it as a data-efficiency study with a mislabeled headline, and note it too ships no code. Elsewhere: D2Quant (2026) is a PTQ method that never compares against ParetoQ and lands 21.7 points below full precision at 2-bit; R2Q (2025) doesn’t mention ParetoQ at all; pQuant publishes neither comparable numbers nor code. ParetoQ is NeurIPS-accepted, beats every auditable baseline across 1–4 bits, and ships an official Meta repo with released checkpoints. If LC-QAT’s code appears, it deserves this same treatment; until then it’s a claim, not a result.

QAT versus PTQ, if you’re coming from the GPTQ note

The GPTQ note covers post-training quantization: take a finished model, round its weights carefully, repair the damage, never train again. That machinery collapses at 2 bits. In the comparison table below, GPTQ at 2 bits scores 35.9, and random guessing on those benchmarks scores about 35. Nothing PTQ-shaped survives four allowed values per weight, because there is no longer a “nearby” grid point to repair toward.

Quantization-aware training takes the opposite bet: put the rounding inside training and let gradient descent find weights that work despite it. Concretely, the model keeps full-precision “shadow” weights. Every forward pass quantizes them on the fly, so the loss is computed with the low-bit weights the deployed model will actually have; the optimizer then updates the shadow copies. One obstacle: rounding is a staircase function whose derivative is zero almost everywhere, so gradients cannot flow through it honestly. The standard workaround, used here, is the straight-through estimator (STE): in the backward pass, pretend the rounding step was the identity function wherever the weight is inside the clipping range, and pass the gradient straight through (utils_quant.py:103). It is a lie, but a productive one, and at QAT’s scale of thousands of steps the lie averages out well enough to train 8B models.

The cost is real training: ParetoQ’s 2-bit runs use around 30B tokens. The payoff is that the network can do what no repair rule can, which is move weights far, and the paper’s most interesting content is measuring when that’s needed.

Finding 1: the 90/10 budget split

Fix a total token budget. How much should go to full-precision pretraining versus QAT? The paper sweeps the ratio on MobileLLM-125M at four bit-widths and gets the same answer everywhere: accuracy climbs slowly with more full-precision share, peaks near 90/10, then falls off a cliff at 100/0 (which is PTQ) because nothing is left for adaptation. QAT from scratch (0/100), the BitNet recipe, loses at every bit-width tested. Initialize from a good full-precision model, then adapt briefly.

Accuracy versus the fraction of the training budget spent on full-precision training, for 1.58-bit, 2-bit, 3-bit and 4-bit quantization. All four curves rise gently to a peak around 0.9, then drop sharply as the fraction approaches 1.0, where no budget remains for quantization-aware training.
Where to spend tokens. Accuracy versus the share of budget spent on full-precision training, MobileLLM-125M. Every bit-width peaks near 90% full-precision, 10% QAT. The right edge (100/0) is pure PTQ; the left edge (0/100) is QAT from scratch. Both lose. Figure from the paper's LaTeX source — Liu et al. (2025), arXiv:2502.02631

The sweep is on a 125M model and the paper extrapolates the 90/10 rule upward; I’d call the exact ratio weakly supported at 8B scale, and the qualitative shape (both endpoints lose, the optimum sits near but not at the full-precision end) strongly supported.

Finding 2: 2 bits is where the model rewrites itself

The paper measures how far weights move during QAT, normalized to their scale. At 3 and 4 bits, weights shift by roughly 10–20%: the network stays near its pretrained solution and the finetuning acts as compensation, the same within-neighborhood adjustment that makes GPTQ-style error repair work. At 2 bits and below, weights move around 40%: the network is not adjusting its old representation, it is reconstructing a new one that happens to be expressible in four values per weight.

Violin plot of normalized weight deviation after QAT for 1-bit, 1.58-bit, 2-bit, 3-bit, and 4-bit. The 1-bit, 1.58-bit and 2-bit distributions center around 0.4 to 0.5 with wide spread; the 3-bit and 4-bit distributions are tight and centered near 0.1.
The transition, measured. How far weights move during QAT, by bit-width. Three and four bits barely move (compensation); two bits and below move drastically (reconstruction). This one plot explains why PTQ works at 4 bits and dies at 2, and why 2-bit needs both more tokens and a different grid. Figure from the paper's LaTeX source — Liu et al. (2025), arXiv:2502.02631

This is the finding I keep thinking about, because it gives the whole field a clean boundary: above the transition, cheap post-hoc methods are fighting for the same within-neighborhood gains as QAT; below it, they are structurally unable to follow, since no local repair reaches a reconstructed solution. It also predicts the token costs: the paper finds 3–4 bit QAT saturates after ~10B tokens while 2-bit and below need ~30B, which is what you’d expect if one regime is touching up and the other is re-learning.

Finding 3: at low bits, the grid is not a detail

Here is the part where the paper earns its “we checked everything” framing. A quantization grid for bb bits has 2b2^b levels, and you must choose where they sit. The standard integer grid (used by LSQ, the method 3/4-bit inherits here) puts levels at {−2b−1,…,2b−1−1}\{-2^{b-1}, \dots, 2^{b-1}-1\} times a step size α\alpha: for 4 bits, sixteen levels from −8α-8\alpha to +7α+7\alpha, including zero. Two properties of that choice go unnoticed at 4 bits and become the whole game at 2. It contains zero, which costs one level; and it is asymmetric (one more negative level than positive), which is irrelevant when you have sixteen levels and painful when you have four: {−2,−1,0,1}α\{-2, -1, 0, 1\}\alpha gives exactly one positive value.

ParetoQ’s proposal for 2-bit and ternary, Stretched Elastic Quant (SEQ), gives up the zero level in exchange for symmetry and even coverage. I verified the grids numerically from the code: SEQ at 2 bits produces levels {−0.75,−0.25,+0.25,+0.75} α\{-0.75, -0.25, +0.25, +0.75\}\,\alpha, four balanced values with no zero, evenly tiling the clipped range; ternary SEQ produces {−23,0,+23} α\{-\tfrac{2}{3}, 0, +\tfrac{2}{3}\}\,\alpha, keeping zero where an odd level count makes it free. The step size α\alpha is not a statistic but a trained parameter, one per output channel, initialized from the channel’s maximum weight (train.py:49–55) and updated by gradient descent with the LSQ scaling rule. The paper’s ablations show the crossover cleanly: SEQ wins at ternary and 2-bit, plain LSQ wins at 3 and 4.

Diagrams of quantization grids: binary sign function; elastic ternarization; LSQ 2-bit with levels minus 2, minus 1, 0, 1; LSQ 3-bit with an extra negative level highlighted; and SEQ variants at ternary, 2-bit and 3-bit whose levels are symmetric around zero and evenly divide the clipped range.
Where the levels sit. Top row: standard grids, where 2-bit LSQ (c) wastes its four levels on an asymmetric zero-containing set. Bottom row: SEQ (e–g) spends the same budget on symmetric levels that evenly tile the range. The red box in (d) marks the imbalanced extra level. At four levels these choices are worth several accuracy points; at sixteen, nobody notices. Figure from the paper's LaTeX source — Liu et al. (2025), arXiv:2502.02631

The mechanism-level punchline connects back to Finding 2: in the reconstruction regime the network is choosing a new weight distribution, so the grid’s job is to offer the most usable set of destinations, and a balanced zero-free set beats a lopsided zero-containing one. In the compensation regime the network wants to stay near its old (roughly zero-centered, outlier-heavy) distribution, and zero plus fine steps wins.

The 2-bit recipe, in full

Since 2-bit is the setting most people will come here for, everything I could pin down about how the headline model was actually trained, in one place. Each value carries its source; where the paper is silent, I say so.

SettingValueSource
Initializationpretrained FP weights; scales α=max⁡∣w∣\alpha = \max\lvert w\rvert per channel§5; train.py:49–55
Quantized layersall linears; embeddings and output layer stay FP§5, confirmed in code
QuantizerSEQ, per-output-channel learned α\alpha, clip 0.99utils_quant.py:151–161
OptimizerAdamW, weight decay 0§5
Learning rate2×10−52\times10^{-5}, cosine decay to zero, no warmup in the demo script§5; 1_run_train.sh
Iterations120,000 (vs 40,000 for 3/4-bit)§5
Batch16 GPUs × 8 per GPU = 128 sequences of 2048 tokens§5; run script
Total tokens120k × 128 × 2048 ≈ 31.5B, matching the quoted “30B”derived
Precisionbf16 compute, TF32 explicitly offrun script; utils_quant.py:13–14
Gradient accumulation, warmup, Adam betasnot stated for the production runabsent from paper
Data~30B tokens, corpus never namedsee below

One trap for the careful reader: the paper contains a second training configuration in its appendix (64 GPUs, learning rate 1×10−41\times10^{-4}, linear decay) which belongs to the MobileLLM-125M budget-sweep experiments behind Finding 1, not to the headline models. Quote the right one.

The loss is plain next-token cross-entropy, and there is no teacher. The repo uses the stock HuggingFace Trainer (train.py:88), labels are a copy of the input tokens (datautils.py:112), and the model calls the default causal-LM loss (modeling_llama_quant.py:869). No distillation, no KL against the full-precision model, no reconstruction penalty, no regularizer on the scales. This is a real differentiator: LLM-QAT distills from the FP model, BitDistiller uses confidence-aware self-distillation, EfficientQAT minimizes block-wise reconstruction error, and ParetoQ beats all of them at 2-bit with the same objective used for pretraining. A leftover in the checkpoint-saving code that filters out parameters named “teacher” (utils.py:44) hints that a distillation variant existed internally; what shipped is teacher-free.

So what is the full-precision model for, if nothing distills from it? It becomes the training state. The FP weights are loaded as the trainable shadow weights that every forward pass projects onto the 2-bit grid, and nothing anchors training back toward them: no L2-to-init term, no teacher signal, just cross-entropy from the starting position. That resolves the apparent tension with Finding 2. Yes, 2-bit training rewrites weights by ~40%, but 30B tokens is around 0.2% of Llama-3’s pretraining and cannot teach language from scratch; all the competence in the final model was paid for during FP pretraining and carried through the rewrite. The from-scratch endpoint of Finding 1, which is the BitNet philosophy, loses at every bit-width for exactly this reason.

During training, the optimizer sees the quantizer through two channels. Weights inside the clipping range get the straight-through gradient (round treated as identity); weights outside get exactly zero, since the clamp is genuinely flat out there (utils_quant.py:240). Frozen weights are not dead, though: the scale α\alpha keeps receiving a boundary-value gradient from clipped weights, so the range can grow to re-capture them. The weight learns inside the fence, the fence learns from what it excludes.

And the data: the corpus is never named. The paper specifies optimizer, schedule, GPUs, and iteration counts, but not what text was trained on; the repo takes a user-supplied JSONL path, and the README’s only hint is that the released base models were trained on “a more advanced data”. Every quantitative claim in this note is therefore attached to the recipe plus Meta’s data, and third-party re-runs on open corpora (RedPajama substitutions, instruction-tuned models) have so far come back weaker, which is the reproduction flank discussed under Limitations.

Paper vs. code

Repo: facebookresearch/ParetoQ at commit 7b36b8d, official, BSD-3. The quantization core is models/utils_quant.py, 290 lines; everything else is a standard training harness. You don’t need to read code to use this section.

What I could match directly:

PaperCode
SEQ for 1.58/2-bit, LSQ for 3/4-bit (Eq. 3)the exact dispatch in QuantizeLinear.forward, utils_quant.py:266–283
SEQ formula α(⌊Clip(w/α)⋅k/2−0.5⌉+0.5)/k×2\alpha(\lfloor\mathrm{Clip}(w/\alpha)\cdot k/2 - 0.5\rceil + 0.5)/k \times 2utils_quant.py:154–159; my grid check reproduces the paper’s stated 2-bit levels
Learned per-channel scaleweight_clip_val, shape (rows, 1), utils_quant.py:259
LSQ gradient for α\alpha with 1/n⋅Qp1/\sqrt{n \cdot Q_p} scalingutils_quant.py:41–44, 76–101, matching the LSQ paper’s recipe
STE with clipping-range gateutils_quant.py:103, 240
Scale init: max⁡∣w∣\max\lvert w\rvert per channel (SEQ), max⁡∣w∣/(2b−1−1)\max\lvert w\rvert/(2^{b-1}-1) (LSQ)train.py:49–55
Embeddings and output layer stay full-precisionstated in §5; confirmed, only nn.Linear replacements are quantized

What the code does that the paper doesn’t say:

  • The paper’s Eq. 3 clips w/αw/\alpha to [−1,1][-1, 1]. Taken literally, the boundary value +1+1 maps to round(1.5)=2\mathrm{round}(1.5) = 2 under round-half-even, producing a fifth level +1.25α+1.25\alpha that does not fit in 2 bits. The code clips to ±0.99\pm 0.99 (clip_val = 1 - 1e-2, utils_quant.py:141), which quietly removes the overflow. I verified both behaviors numerically; the published equation and the shipped quantizer are not the same function, and the code’s version is the correct one.
  • QuantizeLinear hard-disables bias (utils_quant.py:254), fine for Llama-family models which have none, silently wrong for anything with linear biases.
  • The training data pipeline is a user-supplied JSONL path (utils/datautils.py:30); the 30B-token corpus behind the released checkpoints is not shipped, so exact reproduction of the headline numbers is not possible from the repo alone.
  • Gradients through the quantizer are computed in FP32 against the shadow weights, and the quantized weights are cast to the activation dtype per forward (utils_quant.py:274); there is no packed-integer kernel anywhere in the repo. Training-time memory is the full-precision model plus optimizer states; the memory savings exist only after export.

Claims & evidence

Zero-shot accuracy below means the average score over commonsense-reasoning multiple-choice benchmarks (ARC, PIQA, HellaSwag, WinoGrande and similar), where random guessing lands in the mid-30s.

ClaimEvidence in paperVerdict
2-bit Llama-3 8B within 3.4 points of full precision (71.2 vs 74.6)Table 2, five-task average; checkpoints released on HuggingFaceverified as reported; I did not re-run their eval
Beats the best prior QAT (EfficientQAT) by 5.7 points at 2-bitSame table: 71.2 vs 65.5verified per the table, with two caveats: EfficientQAT’s entry is group-wise 2.12 effective bits against ParetoQ’s channel-wise 2.0, so ParetoQ wins with the smaller footprint; and both 71.2 and 65.5 are acc_norm, so they are fairly compared, whereas EfficientQAT’s own paper reports 59.37 (plain acc) for this model, a metric difference and not a disagreement (traced in the EfficientQAT note)
Outperforms the vector-quantization method AQLM by 7.1 points§5 text says AQLM scores 64.1; the paper’s own Table 2 lists AQLM at 70.2, making the margin 1.0 point at a higher 2.27-bit budgetpartial — the text and the table disagree with each other; by the table, ParetoQ still wins but narrowly, against a method spending more bits
~90% FPT / 10% QAT is the optimal budget splitRatio sweep on MobileLLM-125M only (Fig. 3)partial; shape is convincing, the exact ratio is extrapolated to larger models without a sweep
Ternary 600M ParetoQ beats the previous SoTA ternary 3B modelFig. 6, against 1-bit-era checkpointsunverified here — plausible from their figure, but I did not obtain the baseline checkpoints
2-bit QAT behavior transition (compensation vs reconstruction)Weight-deviation analysis, Fig. 4verified as a measurement; the mechanistic interpretation is the authors’ hypothesis, clearly labeled as such

Benchmarks

Llama-3 8B, 2-bit weight quantization. Five-task zero-shot average (acc_norm where the task defines it, higher is better) and WikiText2 perplexity (lower is better), from the paper’s Table 2, which was built from the baselines’ released models:

MethodTypeEffective bitsAvg. acc.Wiki2 ppl
Full precisionn/a1674.66.15
RTNPTQ235.71.2e6
GPTQPTQ235.9162
SpinQuantPTQ238.131.2
LLM-QATQAT254.329.5
AQLMPTQ+FT2.2770.2n/a
EfficientQATQAT2.1265.59.6
ParetoQQAT271.28.0

Read it in three tiers. Pure PTQ (RTN, GPTQ, SpinQuant) is at or near chance: 2-bit is simply past what post-hoc repair can reach, which is the reconstruction regime made visible. Older QAT (LLM-QAT) survives but bleeds twenty points. The modern contenders (AQLM with vector codebooks and finetuning, EfficientQAT, ParetoQ) form the real race, and ParetoQ leads it while using the fewest effective bits of the three. One cell worth a footnote: EfficientQAT’s 65.5 here is ParetoQ’s acc_norm re-run of the released checkpoint, while EfficientQAT’s own paper reports 59.37 for the same model under plain acc. Both are right for their own tables and the gap is entirely the metric, traced in the EfficientQAT note; this whole table is acc_norm, so its rows are metric-consistent with each other.

Three scatter panels comparing average zero-shot accuracy over eight tasks for 2-bit, 3-bit and 4-bit quantization across MobileLLM and Llama-3 model sizes. ParetoQ's curve sits at or near the top in every panel; at 2-bit the gap over GPTQ, AWQ, OmniQ, LLM-QAT and SpinQuant is dramatic, and it narrows as bits increase.
The margin shrinks as bits grow. Eight-task zero-shot averages across model sizes. At 4-bit (right), most methods bunch together and PTQ is fine. At 2-bit (left), ParetoQ is the only method within sight of full precision. The lesson generalizes: method choice matters in inverse proportion to the bit budget. Figure from the paper's LaTeX source — Liu et al. (2025), arXiv:2502.02631

Limitations & open questions

The cost is the story the headline hides. Thirty billion tokens of QAT for the 2-bit 8B model is a real pretraining-scale bill, thousands of GPU-hours, not the four GPU-hours of a GPTQ run. Whether that cost is worth four points over EfficientQAT (which needs ~41 GPU-hours) depends entirely on how many devices will serve the model.

Effective-bits bookkeeping muddies every low-bit comparison, this one included. ParetoQ reports channel-wise 2.0-bit numbers against baselines at 2.12 and 2.27 effective bits; that makes its win more impressive, but the table’s bit column deserves as much attention as its accuracy column, and most citations of the paper drop it.

The largest model is 8B. Nothing here says what the compensation/reconstruction boundary does at 70B, where per-parameter capacity is more redundant and PTQ methods (the AQLM/QuIP# family) historically close the gap.

The scale claims stop at accuracy: the repo contains no low-bit inference kernel, so the deployment story (2-bit is faster and smaller in practice) rests on the paper’s appendix hardware experiments, which I did not audit.

And the reproducibility gap: without the training corpus, nobody outside Meta can regenerate the headline numbers, only evaluate the released checkpoints. Two 2026 threads press on this from different sides. LC-QAT’s claim of a better task average with a tenth of the tokens would, if its code ever surfaces, change the cost calculus substantially, though its worse perplexity suggests the win is not uniform. And an under-review line of work (“Compensate, Don’t Reconstruct”, OpenReview 2026) reports that ParetoQ’s recipe degrades on instruction-tuned models when reproduced with open-source data; I could not access their numbers past OpenReview’s bot wall, but the direction of the critique is plausible, since everything in this note was measured on base models with Meta’s internal corpus.

Reproduction notes

Marked partial, meaning: on 2026-07-12 I read models/utils_quant.py and the relevant parts of train.py end to end at commit 7b36b8d and matched them against the paper’s equations, which is the Paper-vs-code section. I reimplemented both quantizer forward passes in NumPy and verified the grids the paper describes, including the boundary overflow in the published equation that the code’s 0.99 clip fixes; the script is at verification/paretoq-low-bit-qat/checks.py and every quoted level set prints as a PASS line. Benchmark numbers were transcribed from the paper’s LaTeX table source, not from screenshots.

What I did not do: re-run any training (the 2-bit recipe needs ~30B tokens and the corpus isn’t public) or re-evaluate the released HuggingFace checkpoints, which is the natural next step for anyone wanting to promote the headline claim from “verified as reported” to “reproduced”. The checkpoints are at facebook/MobileLLM-ParetoQ-* if you want to run that eval before I do.